
Punta Cana, La Altagracia
Punta Cana, La Altagracia
Price on request
Located in the heart of Nisibón, Dominican Republic, within the private community The Reserve. Just 10 minutes from pristine beaches and 60 minutes from Punta Cana International Airport. Surrounded by mountains, ecological trails and a natural low-density environment, this development positions itself as the new epicenter of value appreciation in the region.
Concept and Philosophy
The project redefines luxury through conscious and sustainable modular architecture, which integrates: Construction with recycled High-Cube steel.
Advanced thermal insulation and strategic cross ventilation.
Bioclimatic design that connects interior and exterior in balance with nature.
Its vision: "Redefine luxury through conscious preservation of the environment".
Residence Typology
Smart modular Eco Suite: 67.5 m² of total construction with living-dining room, kitchen, bedroom and bathroom.
Interior: 35 m².
Terrace: 20 m².
Parking: 12.5 m².
Lots between 138.60 and 194.90 m².
Base price: US$ 95,000.
Customization Packages
Deluxe (+US$ 15,000 / +US$ 30,000): premium equipment, ideal for Airbnb.
Royal (+US$ 30,000): total energy autonomy, ultimate eco-luxury experience.
All packages include white goods (stove, range hood and air conditioners).
Amenities and Lifestyle
Ecological pool and country club.
Ecological trails and MTB cycling routes.
Horseback riding and guided excursions in Nisibón.
Wellness & Yoga Deck, natural spa and glamping suites.
Bonfire area and stargazing viewpoint.
Exclusive benefits in gastronomy and local clubs.
Comprehensive Property Management
Optional premium hotel administration.
Automatic synchronization with Airbnb, Booking.com and Expedia.
Dynamic rates with AI to maximize income.
Professional hotel cleaning and maintenance.
Exclusive digital portal for owners with real-time reports.
Payment Plans
Plan A: Reservation US$ 500 (refundable), 20% upon signing, 30% during construction, 50% upon delivery.
Plan B: Reservation US$ 500 (refundable), 10% upon signing, 50% during construction, 40% upon delivery.
Early payment discount: 5% if 50% is paid upon contract signing.
